Categories: Business

PIDG company, Emerging Africa Infrastructure Fund, lending €25 million to Côte d’Ivoire clean energy hydro-electricity project

Spread the news

The Emerging Africa Infrastructure Fund (EAIF), a Private Infrastructure Development Group (PIDG) company, is lending €25 million over 18 years to Ivoire Hydro Energy (IHE) which will build a 44MW hydro electricity generation plant on the Bandama River near the village of Singrobo in Côte d’Ivoire. Financial close is expected in late Q3 2021. The  €174 million project is forecast to take some 36 months to build.

Paromita Chatterjee, an Investment Director at EAIF’s managers, Ninety One, says;

“The new facility being built at Singrobo is the country’s first hydroelectric development by an independent power producer. The project has seen EAIF and PIDG deliver on three core objectives; mobilising private capital, enabling economic development and contributing to increasing Africa’s stock of renewable energy  infrastructure.”

A long-term power purchase agreement will see all of the energy produced by the Singrobo plant sold to Compagnie Ivoirienne d’Electricité, the operator of Côte d’Ivoire’s national grid. The new plant will be an important strategic economic asset for Côte d’Ivoire. In addition to adding to the country’s generation capacity, the plant enhances the system’s flexibility, meaning it may be called in to meet base load demand as well as peak demand.

The African Development Bank (AfDB) acted as the mandated lead arranger of the debt finance and will be a senior lender in its own right. In addition to AfDB and EAIF, the other lenders are the German international development agency, DEG and the Africa Finance Corporation (AFC). 25% of the project cost is funded by equity from the project’s shareholders, IHE Holding, the Africa Finance Corporation and DIPFA, a Denham Capital owned international investment platform for power projects.  Neo Themis SARL is advising and acting for the shareholders in relation to finalising the project’s development and the financing agreements.

Electrification rates in Côte d’Ivoire range from c88% in urban areas to as low as 31% in rural parts of the country. Côte d’Ivoire’s economy has been growing and diversifying since the return of political stability in 2011. It has the largest and most diversified economy in the West African Economic and Monetary Union, representing c30% of the monetary union’s total GDP.

Technical information

The Project site is located on the Bandama River, 23 km downstream of the existing Taabo Dam and upstream of the confluence of the Nzi River. It is 3.5 km from the Singrobo village in the province of Taabo and some 148 km by road from Côte d’Ivoire’s  capital city, Abidjan.

Singrobo plant main infrastructure

  • A rockfill dam on the right bank of approx. 27m height and 1,025m length
  • On the left bank, a concrete dam of approximately 27m high and 150m long
  • At the centre, a spillway, water intake structure and bottom outlet
  • A reservoir with an area of maximum 19.6 km2 and a volume of approximately 105 hm3
  • Two penstocks with a diameter of 5m
  • A power-house with two horizontal 22 MW Kaplan turbines supplied by GE/ Alstom
  • A 1.3 km long and 35 m wide tailrace channel
  • 3 km of access roads
  • Camp site facilities comprising construction facilities and a permanent O&M camp site
  • A 4km 90 kV transmission line and substation to connect to the hydropower plant to the existing Taabo-Agboville transmission line

Advisers

International Legal CounselNorton Rose Fulbright LLP
Local Legal CounselBilé-Aka, Brizoua-Bi & Associés
Lenders Technical Advisor “LTA”Royal HaskoningDHV
Lenders advisor for construction monitoringMottMcDonald
E&S AdvisorRoyal HaskoningDHV, ERM
Model Audit and Tax advisorMazars LLP
Insurance Advisor / BrokerINDECS Consulting / Platinum (local insurance broker)

Source: Private Infrastructure Development Group (PIDG)

TOA Correspondent

Recent Posts

The top Nigerian who hated his own voice

Nigeria’s leading music figure and vocalist, Cobhams Asuquo, known for his singing and production said…

3 years ago

South African court halts Amazon HQ project

Following a mixed reaction from the South African community representatives, Khoi and San, the Cape…

3 years ago

How Digitalization in African Rail Transportation Is Enhancing Safety?

Mitigating the process and service barriers in African rail transportation, the digital disruption has transformed…

3 years ago

Tunisian leader to allow public views on reforms

Kais Saied, the Tunisian president has said in his speech that he will allow the…

3 years ago

The power of Niacinamide in the trending African skincare market

You know the credibility of an ingredient when it’s plastered all over bottles and jars…

3 years ago

Mozambique death toll from Cyclone Gombe rises to 48

Cyclone Gombe that flooded large areas of central and northern Mozambique is consistently leading to…

3 years ago

This website uses cookies.